D. Point of Delivery is the outlet of the service meter assembly, or the outlet of the service<br />

regulator (service shutoff valve when no meter is provided).<br />

1.03 SUBMITTALS:<br />

A. Product data for each gas piping specialty and special duty valve. Include rated capacities<br />

of selected models, furnished specialties and accessories, and installation instructions.<br />

B. Shop drawings detailing dimensions, required clearances, for connection to gas meter.<br />

C. Record Drawings: At project closeout, submit record drawings of installed systems<br />

products, in accordance with requirements of Division 23.<br />

D. Maintenance data for gas specialties and special duty valves, for inclusion in the<br />

Operating and Maintenance Manual specified in Division 23.<br />

E. Welders’ qualification certificates, certifying that welders comply with the quality<br />

requirements specified under "Quality Assurance" below.<br />

F. Test reports specified in Part 3 below.<br />

1.04 QUALITY ASSURANCE:<br />

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of natural gas<br />

systems products, of types, materials, sizes required, whose products have been in<br />

satisfactory use in similar service for not less than 5 years.<br />

B. Installer Qualifications: Installation and replacement of gas piping, gas utilization<br />

equipment or accessories, and repair and servicing of equipment shall be performed only<br />

by a qualified installer. The term “qualified” is defined as experienced in such work<br />

(experienced shall mean having a minimum of 5 previous projects similar in size and<br />

scope to this project), familiar with precautions required, and has complied with the<br />

requirements of the authority having jurisdiction. Upon <strong>request</strong>, submit evidence of such<br />

qualifications to the Architect.<br />

C. Qualifications for Welding Processes and Operators: Comply with the requirements of<br />

ASME Boiler and Pressure Vessel Code, "Welding and Brazing Qualification."<br />

D. Regulatory Requirements: Comply with the requirements of the following codes:<br />

1. NFPA 54 – National Fuel Gas Code, for gas piping materials and components,<br />

gas piping installations, and inspection, testing, and purging of gas piping<br />

systems.<br />

2. Local Building Code.<br />

3. Utility Compliance: Fabricate and install natural gas systems in accordance with<br />

local gas utility company requirements.<br />

4. UMC Compliance: Fabricate and install natural gas systems in accordance with<br />

IAPMO "Uniform Mechanical Code."<br />

1.05 DELIVERY, STORAGE, AND HANDLING:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1123 - 2 FACILITY NATURAL-GAS PIPING