3.11 COMMISSIONING:<br />

8. Furnish a copy of test report of complete and adequate sterilization to the<br />

Architect/Engineer before final acceptance of work. Certificates shall bear<br />

signature of an official of laboratory responsible for test.<br />

A. Fill system and perform initial chemical treatment.<br />

B. Check expansion tanks to determine that they are not air bound and that the system is<br />

completely full of water.<br />

C. Before operating the system, perform the following steps:<br />

1. Open valves to full open position. Close coil bypass valves.<br />

2. Remove and clean strainers.<br />

3. Check pump for proper rotation and proper wiring.<br />

4. Set automatic fill valves for required system pressure.<br />

5. Check air vents at high points of systems and determine if all are installed and<br />

operating freely (automatic type) or able to bleed air completely (manual type).<br />

6. Set temperature controls so all coils are calling for full flow.<br />

7. Check operation of automatic bypass valve.<br />

8. Check and set operating temperatures of boilers, chillers, and cooling towers to<br />

design requirements.<br />

9. Lubricate motors and bearings.<br />

Project No.: 10145<br />

550 15th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 23 2113<br />

23 2113 - 19 HYDRONIC PIPING