3.3 CONNECTIONS<br />

A. Ground equipment according to Section 26 0526 "Grounding and Bonding for Electrical Systems."<br />

B. Connect wiring according to Section 26 0519 "Low-Voltage Electrical Power Conductors and<br />

Cables."<br />

3.4 FIELD QUALITY CONTROL<br />

A. Perform tests and inspections and prepare test reports.<br />

B. Tests and Inspections:<br />

1. Perform each visual and mechanical inspection and electrical test stated in NETA<br />

Acceptance Testing Specification.<br />

C. Remove and replace units that do not pass tests or inspections and retest as specified above.<br />

3.5 CLEANING<br />

A. Vacuum dirt and debris; do not use compressed air to assist in cleaning.<br />

Project No.: 10145<br />

550 15th Street Dual Brand Hotel<br />

03/19/2012<br />

END OF SECTION 26 2200<br />

262200 - 4 LOW-VOLTAGE TRANSFORMERS