A. Hangers for single pipes shall be adjustable clevis hangers, zinc-plated for steel pipes and<br />

copper-plated for copper pipes. Hangers for insulated pipes shall be oversized to<br />

accommodate pipe insulation thickness.<br />

B. Install hangers, supports, clamps and attachments to support piping properly from<br />

building structure; comply with MSS SP-69 and SP-89. Arrange for grouping of parallel<br />

runs of horizontal piping to be supported together on field-fabricated, heavy-duty trapeze<br />

hangers where possible. Install supports with maximum spacings complying with MSS SP-<br />

69. Where piping of various sizes is supported together by trapeze hangers, space<br />

hangers for smallest pipe size or install intermediate supports for smaller diameter pipe.<br />

Do not use wire or perforated metal to support piping, and do not support piping from<br />

other piping.<br />

C. Install hangers and supports complete with all necessary inserts, bolts, rods, nuts, washers<br />

and other accessories.<br />

D. Provide electrolysis isolators at all hangers and supports for domestic water, condenser<br />

water, and other water lines which are not insulated.<br />

E. Prevent electrolysis and abrasion in support of copper tubing by use of hangers and<br />

supports which are plastic coated, or with EPDM isolation strips. Duct tape or copper<br />

coated hangers are not acceptable.<br />

F. Support fire water piping independently from other piping systems.<br />

G. Install hangers and supports to allow for controlled movement of piping systems, to permit<br />

freedom of movement between pipe anchors, and to facilitate action of expansion joints,<br />

expansion loops, expansion bends and similar units. Install hangers and supports within<br />

1’– 0” of each horizontal elbow.<br />

H. Load Distribution: Install hangers and supports so that piping live and dead loading and<br />

stresses from movement will not be transmitted to connected equipment.<br />

I. Provide vibration isolators on the first three supports upstream and downstream of<br />

equipment equipped with flexible connectors such as pumps, chillers, cooling towers, etc.<br />

J. Pipe Sloping: Install hangers and supports to provide indicated pipe sloping, and so that<br />

maximum pipe deflections allowed by ANSI B31.9 Building Services Piping Code are not<br />

exceeded.<br />

K. Insulated Piping: Comply with the following installation requirements:<br />

1. Clamps: Attach clamps, including spacers (if any), to piping with clamps<br />

projecting through insulation; do not exceed pipe stresses allowed by ANSI B31.<br />

2. Saddles: Install protection saddles, MSS Type 39, where supported by pipe rollers.<br />

Fill interior voids with segments of insulation that match adjoining pipe insulation.<br />

3. Shields:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

a. Install galvanized steel 180° insulation protection shields on all insulated<br />

piping of sizes 2” and smaller, except where required to be clamped.<br />

Where necessary to prevent dislocation, strap shield to pipe with wire ties<br />

or "Zip Strips." Insulation shall be continuous through hanger.<br />

b. Insulation lengths and galvanized steel saddle lengths and gauges<br />

(minimums) shall comply with Table 1 below. Where pipe hanger spacing<br />