K. Equipment Exposed to Weather: Protect outdoor insulation from weather by installation of<br />

aluminum jacketing, as recommended by manufacturer. On flexible elastomeric<br />

insulation, apply two (2) coats of manufacturer's approved U.V. resistant finish.<br />

3.08 EXISTING INSULATION REPAIR:<br />

A. Repair damaged sections of existing mechanical insulation, both previously damaged or<br />

damaged during this construction period. Use insulation of same thickness as existing<br />

insulation; install new jacket lapping and seal over existing.<br />

3.09 PROTECTION AND REPLACEMENT:<br />

A. Replace all damaged insulation which cannot be repaired satisfactorily, including units<br />

with vapor barrier damage and moisture saturated units.<br />

B. Protection: Insulation Installer shall advise Contractor of required protection for insulation<br />

work during remainder of construction period, to avoid damage and deterioration.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 23 0713<br />

23 0713 - 12 MECHANICAL INSULATION