hook-ups, tie-ins, and terminations have been completed and signed off on the<br />

manufacturer’s start-up <strong>request</strong> form.<br />

B. The system manufacturer or factory-trained representative shall provide on-site training for<br />

Owner’s personnel. This training shall fully cover operation and maintenance of all system<br />

components.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 22 1123<br />

221123 - 7 PLUMBING PUMPS