L. Install all mechanical equipment in such a manner as to facilitate maintenance and repair<br />

or replacement of equipment components. As much as practical, connect equipment for<br />

ease of disconnecting, with minimum of interference with other installations.<br />

M. Coordinate connection of mechanical systems with exterior underground and overhead<br />

utilities and services. Comply with requirements of governing regulations, franchised<br />

service companies, and controlling agencies. Provide required connection for each<br />

service.<br />

N. The Contractor shall provide all labor and material required for all necessary ancillary<br />

work, including, but not limited to, the starting/stopping of all mechanical equipment,<br />

opening/closing of all valves, draining/refilling of all mechanical systems and<br />

operating/verifying the operation of all mechanical systems and controls as required to<br />

accomplish all work necessary to meet construction document requirements.<br />

O. Drawings are not intended to show complete or accurate details of buildings, equipment,<br />

ductwork and piping in every respect. They indicate general layout, approximate<br />

locations, relations and arrangements and are not intended to show details of<br />

manufacturer’s equipment. Details of equipment shall be furnished by manufacturer and<br />

Contractor for Architect/Engineer’s review.<br />

P. Not all details of piping systems are shown on drawings nor are they specified herein.<br />

Piping shall be such as to legally pass all inspections by the local Inspection Department,<br />

State and Federal Authorities and Insurance Company having jurisdiction. Any changes or<br />

additions which may be necessary to obtain such inspection and approval shall be made<br />

by the Contractor as a part of this Contract without additional cost to the Owner.<br />

Q. Unless otherwise indicated, all equipment and performance data listed is for job site<br />

conditions (elevation 5,280 ft.).<br />

1.13 EXCAVATING AND BACKFILLING:<br />

A. General:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

1. Provide all necessary excavation and backfill for installation of mechanical work in<br />

accordance with Division 21,22 and 23 (beneath building and 5’-0” beyond)<br />

B. Contact Owners of all underground utilities to have them located and marked, at least 2<br />

business days before excavation is to begin. Also, prior to starting excavation, brief<br />

employees on marking and color codes, and train employees on excavation and safety<br />

procedures for natural gas lines. When excavation approaches gas lines, expose lines by<br />

carefully probing and hand digging.<br />

1.14 CUTTING AND PATCHING:<br />

A. This Article specifies the cutting and patching of mechanical equipment, components, and<br />

materials and includes removal and legal disposal of selected materials, components, and<br />

equipment.<br />

B. Portable ventilation fans shall be provided for any procedure which generates smoke, dust,<br />

dirt, etc.<br />

23 0010 - 6 BASIC MECHANICAL REQUIREMENTS