shall be the products of a single manufacturer. Grooving tools shall be of the same<br />

manufacturer as the grooved components.<br />

L. The gasket style and elastomeric material (grade) shall be verified as suitable for the<br />

intended service as specified. Gaskets shall be molded and produced by Victaulic.<br />

M. Grooved end shall be clean and free from indentations, projections, and roll marks in the<br />

area from pipe end to groove for proper gasket sealing.<br />

N. A Victaulic factory-trained field representative shall provide on-site training for contractor's<br />

field personnel in the proper use of grooving tools and installation of grooved piping<br />

products. Factory-trained representative shall periodically review the product installation.<br />

Contractor shall remove and replace any improperly installed products.<br />

3.05 EXPOSED PIPING IN FINISHED AREAS:<br />

A. Plumbing piping and fittings which are exposed (and uninsulated) in finished areas<br />

generally occupied by people, including, but not limited to, kitchens, animal<br />

cagewash/equipment washing rooms, hospital autoclave or sterilizing rooms, shall be<br />

installed with a smooth, high polish, durable chrome-plated finish.<br />

3.06 PIPING TESTS:<br />

A. General: Provide temporary equipment for testing, including pump and gauges. Test<br />

piping system before insulation is installed, wherever feasible; and remove control devices<br />

before testing. Test each natural section of each piping system independently, but do not<br />

use piping system valves to isolate sections where test pressure exceeds valve pressure<br />

rating. Fill each section with water, and pressurize for indicated pressure and time<br />

duration.<br />

B. Test all piping systems as specified. Correct leaks by remaking joints. Remove equipment<br />

not able to withstand test procedure during test.<br />

C. Work to be installed shall remain uncovered until the required tests have been completed.<br />

D. Piping which is to be concealed shall be tested before being permanently enclosed.<br />

E. When work has been completed, conduct preliminary tests to ascertain compliance with<br />

specified requirements. Make repairs or replacements as required.<br />

F. Give a minimum of twenty-four hours notice to Engineer of dates when acceptance test will<br />

be conducted. Conduct tests as specified for each system in presence of representative of<br />

agency having jurisdiction or his representative.<br />

G. Submit three (3) copies of successful test report to the Engineer for his review. Report shall<br />

state the following: Date of test, lines tested, test medium, length of time, test pressure<br />

held, pressure drop or rise, and extent of venting or repressurizing.<br />

H. Contractor shall obtain certificates of approval, acceptance and compliance with<br />

regulations of agencies having jurisdiction. Work shall not be considered complete until<br />

such certificates have been delivered by the Engineer to the Owner.<br />

Project No.: 10145<br />

550 15th Street Dual Brand Hotel<br />

03/16/2012<br />

23 2113 - 15 HYDRONIC PIPING