Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

1-1/4" through 2" 10'-0" 3/8"<br />

2-1/2" through 5" 12'-0" 1/2"<br />

6" through 8" 14'-0" 3/4"<br />

Note: Maximum hanger spacings shown in Table 2 are based on maximum sag of 0.1” between<br />

hangers for straight pipe. Hanger spacing must be reduced to compensate for any valves and/or<br />

fittings installed in the pipe run. Spacing shall limit sag to 0.1” between hangers. Minimum<br />

hanger spacing for fire protection piping shall be per appropriate NFPA requirements.<br />

M. Support cast iron piping, in addition to the requirements of Table 3, as follows:<br />

1. Hub & Spigot – All sizes: One hanger to each joint, minimum.<br />

2. No-Hub – All sizes:<br />

a. With Clamp-All and Anaheim Series 4000 stainless steel couplings and<br />

MG cast iron couplings: one hanger to each joint.<br />

b. With all other stainless steel band-type couplings: one hanger to each<br />

side of joint.<br />

3. Support all horizontal cast iron pipe within 18 inches of each joint.<br />

4. Use hanger rods same size as required for steel.<br />

5. Support vertical cast iron pipe at each story height and at its base. Secure vertical<br />

hub-and-spigot pipe immediately below the hub. Support vertical no-hub pipe so<br />

that the weight is carried from the pipe to the support and not from the joint to the<br />

support.<br />

N. Place a hanger within one foot (0.305 m) of each horizontal elbow.<br />

O. Use hangers which are vertically adjustable 1-1/2 inches (38.1 mm) minimum after piping<br />

is erected.<br />

P. Support vertical steel and copper piping at every story height, but at not more than 15-foot<br />

intervals for steel and cast iron and 10-foot intervals for copper.<br />

Q. Where several pipes can be installed in parallel and at same elevation, provide trapeze<br />

hangers. All hanger members shall be sized with 5-to-1 safety factor. Verify load bearing<br />

capacity of structure before installation of trapeze hangers.<br />

R. Where practical, support riser piping independently of connected horizontal piping.<br />

S. Support steam supply and condensate return pipe runs on adjustable roller hangers.<br />

T. Each pipe drop to equipment shall be adequately supported. All supporting lugs or guides<br />

shall be securely anchored to the building structure.<br />

U. Securely anchor and support plumbing domestic water piping in chases or walls. Use<br />

factory manufactured clamps and brackets connected to fixture carriers, wall studs or floor.<br />

Wires or straps will not be permitted.<br />

1. When copper supplies are connected to flush valves, support the tubing by the<br />

studs or by a fixture carrier, not by clamping to waste/vent piping.<br />

23 0529 - 9 HANGERS AND SUPPORTS FOR<br />

HVAC PIPING AND EQUIPMENT