25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PART 1 – GENERAL<br />

1.01 DESCRIPTION OF WORK:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

SECTION 23 0553<br />

MECHANICAL IDENTIFICATION<br />

A. Extent of mechanical identification work required by this Section is indicated on the<br />

drawings and/or specified in other Division 23 sections.<br />

B. Types of identification devices specified in this section include the following:<br />

1.02 QUALITY ASSURANCE:<br />

1. Painted Identification Materials<br />

2. Plastic Pipe Markers<br />

3. Plastic Tape<br />

4. Underground-Type Plastic Line Marker<br />

5. Plastic Duct Markers<br />

6. Valve Tags<br />

7. Valve Schedule Frames<br />

8. Engraved Plastic-Laminate Signs<br />

9. Plastic Equipment Markers<br />

10. Plasticized Tags<br />

A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of identification<br />

devices of the types and sizes required, whose products have been in satisfactory use in<br />

similar service for not less than 5 years.<br />

B. Codes and Standards:<br />

1.03 SUBMITTALS:<br />

1. ANSI Standards: Comply with ANSI A13.1 for lettering size, length of color field,<br />

colors, and viewing angles of identification devices.<br />

A. Product Data: Submit manufacturer's technical product data and installation instructions<br />

for each identification material and device required.<br />

B. Schedules: Submit valve schedule for each piping system, typewritten and reproduced on<br />

8-1/2” x 11” bond paper. Tabulate valve number, piping system, system abbreviation (as<br />

shown on tag), location of valve (room or space), size of valve, and variations for<br />

identification (if any). Only tag valves which are intended for emergency shut-off and<br />

similar special uses, such as valves to isolate individual system risers and individual floor<br />

branches, and building system shut-off valves. In addition to mounted copies of the valve<br />

schedules, furnish extra copies for Operating and Maintenance Manuals as specified in<br />

Division 23.<br />

23 0553 - 1 IDENTIFICATION FOR HVAC PIPING<br />

AND EQUIPMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!