25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 3 – EXECUTION<br />

3.01 EXAMINATION:<br />

7. For two-position service, the actuator shall be rated at a 20% duty cycle (i.e., 12<br />

minutes extended duty in every hour, or alternatively, one complete cycle every two<br />

minutes). For frequent cycling and modulating service, the actuator shall be rated<br />

for continuous duty, capable of operating 100% of the time at an ambient<br />

temperature of 104ºF (40°C).<br />

8. The actuator shall have a permanently lubricated, self-locking gear train. Motor<br />

brakes shall not be required to maintain desired valve position. Levers or latches<br />

shall not be required to engage or disengage the manual override. Mechanical<br />

travel stops, adjustable to 15º in each direction of 90º rotation, shall be standard,<br />

as well as two adjustable travel limit switches with electrically isolated contacts.<br />

Additional adjustable switches shall be provided where required to meet the<br />

sequence of operation.<br />

9. The motor shall have Class B insulation capable of withstanding locked rotor<br />

current for 25 seconds without overheating. Wiring shall also have Class B<br />

insulation. An auto-reset thermal cut-out protector shall be embedded in the<br />

motor windings. The motor shall be UL recognized and CSA approved.<br />

Disassembly of gears shall not be required to remove the motor.<br />

10. Materials:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

a. The electric actuator shall have a pressure die-cast, hard-anodized<br />

aluminum base and cover. The compound gear shall be made of diecast,<br />

hard-anodized aluminum or steel. An alloy steel worm gear shall be<br />

provided for manual override and torque limiting. Bearings for gears<br />

shall be of the ball and needle type; bronze bearings shall be used on the<br />

shafting parts.<br />

11. Electric Valve Actuator Accessories:<br />

a. Provide thermostatically controlled heaters for all exterior valves.<br />

b. Provide potentiometer or 4-20 mA transmitter for providing continuous<br />

feedback of actuator position where required to meet the sequence of<br />

operations.<br />

c. Provide an electronic servo amplifier and speed control module capable<br />

of accepting a 0-5 Kohm, 4-20 mA DC or other input signal for all<br />

modulating control valves.<br />

A. Install valves in accordance with manufacturer’s instructions, including recommended<br />

lubrication.<br />

B. Examine valve interior through the end ports for cleanliness, freedom from foreign matter<br />

and corrosion. Remove special packing materials, such as blocks used which prevent disc<br />

movement during shipping and handling.<br />

C. Actuate valve through an open-close and close-open cycle. Examine functionally<br />

significant features, such as guides and seats made accessible by such actuation.<br />

Following examination, return the valve closure member to the position in which it was<br />

shipped.<br />

23 0523 - 7 GENERAL-DUTY VALVES FOR<br />

HVAC PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!