25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

corrections for inclusion in the Operating and Maintenance Manual. Submittals marked<br />

"Make Corrections Noted" shall not be resubmitted during the submittal process.<br />

F. Submittals shall include the following specified materials and, in addition, any materials<br />

not listed below but which are specified in the individual sections of Division 23 which<br />

follow:<br />

Pipe Markers.<br />

Water treatment equipment, including water softeners.<br />

Valves, including pressure relief and pressure regulating.<br />

Pumps.<br />

Tanks, including expansion and fuel storage.<br />

Thermometers and pressure gauges.<br />

Boilers, burners, trim and feed equipment.<br />

Piping specialties, including hot water and steam.<br />

Supports, anchors and seals.<br />

Expansion compensators.<br />

Flexible pipe connectors.<br />

Water flow meters.<br />

Vibration isolators.<br />

Insulation, including plastic pipe fitting insulation covers and manufacturer's<br />

installation instructions.<br />

Heat exchangers.<br />

Terminal heat transfer units.<br />

Air conditioning equipment and specialties.<br />

Fans, ductwork, dampers, louvers, grilles, registers and diffusers.<br />

Automatic control systems.<br />

Wiring diagrams, control panelboards, motor test data, motors, starters and<br />

controls for electrically operated equipment furnished by mechanical trades.<br />

Identify each item with specification section and sufficient data to certify its compliance with the<br />

specifications.<br />

1.20 JOB SITE PERSONNEL:<br />

A. Furnish the services of an experienced superintendent who shall be constantly in charge of<br />

all installation work and shall supervise all skilled workmen, plumbers, fitters, metal<br />

workers, welders, helpers, and labor required to unload, transfer, erect, connect-up,<br />

adjust, start, operate, and test each system.<br />

1.21 WORKMANSHIP:<br />

A. The appearance of the finished work shall be of equal importance with its mechanical<br />

efficiency. All work shall be done in accordance with acceptable commercial practices.<br />

1.22 QUIET OPERATION AND VIBRATION:<br />

A. Mechanical equipment provided under this contract shall operate under all load conditions<br />

without noise or vibration which is objectionable in the opinion of the Engineer. In the<br />

case of rotating machinery, noise or vibration noticeable outside of the room in which it is<br />

installed, or annoyingly noticeable inside its own room, will be considered objectionable.<br />

Noise or vibration conditions considered objectionable by the Engineer shall be corrected<br />

23 0010 - 10 BASIC MECHANICAL REQUIREMENTS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!