3.06 ADJUSTING AND CLEANING:<br />

A. Clean each vibration control unit, and verify that each is working freely and that there is<br />

no dirt or debris in immediate vicinity of unit that could possibly short- circuit unit isolation.<br />

3.07 DEFLECTION MEASUREMENTS:<br />

A. Upon completion of vibration isolation work, prepare report showing measured equipment<br />

deflections, theoretical floor deflection and isolation efficiency for each major item of<br />

equipment.<br />

3.08 QUIET OPERATION AND VIBRATION:<br />

A. Mechanical equipment provided under this contract shall operate under all load conditions<br />

without noise or vibration which is objectionable in the opinion of the Engineer. In the<br />

case of rotating machinery, noise or vibration noticeable outside of the room in which it is<br />

installed, or annoyingly noticeable inside its own room, will be considered objectionable.<br />

Noise or vibration conditions considered objectionable by the Engineer shall be corrected<br />

in an approved manner by the Contractor at his expense. Vibration control shall be<br />

accomplished by means of approved vibration isolators installed in a manner<br />

recommended by the manufacturer of the isolators.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 22 0548<br />

22 0548 - 11 VIBRATION AND SEISMIC<br />

CONTROLS FOR PLUMBING<br />

PIPING AND EQUIPMENT