C. Certification of Pump Performance: Provide pumps whose performance, under specified<br />

operating conditions, is certified by manufacturer.<br />

1.03 SUBMITTALS:<br />

A. Product Data: Submit manufacturer's pump specifications, installation and start-up<br />

instructions, and current accurate pump characteristic performance curves, including pump<br />

curve and system curves, with selection points clearly indicated.<br />

B. Shop Drawings: Submit manufacturer's assembly-type shop drawings indicating<br />

dimensions, weight loadings, required clearances, and methods of assembly of<br />

components.<br />

C. Wiring Diagrams: Submit manufacturer's electrical requirements for power supply wiring<br />

to plumbing pumps. Submit manufacturer's ladder-type wiring diagrams for interlock and<br />

control wiring. Diagrams shall clearly differentiate between portions of wiring that are<br />

factory-installed and portions to be field-installed.<br />

D. Maintenance Data: Submit maintenance data and parts lists for each type of pump,<br />

control, and accessory, including "trouble-shooting" maintenance guide. Include this data,<br />

product data, shop drawings, and wiring diagrams in the Operating and Maintenance<br />

Manual, in accordance with the requirements of Division 15.<br />

E. Submit sequence of operation (domestic water booster system).<br />

F. Submittals must be specific to this project. Generic submittals will not be accepted.<br />

1.04 PRODUCT DELIVERY, STORAGE, AND HANDLING<br />

A. Handle plumbing pumps and components carefully to prevent damage, breaking, denting<br />

and scoring. Do not install damaged plumbing pumps or components; replace with new.<br />

B. Store plumbing pumps and components in a clean, dry location. Protect from weather,<br />

dirt, fumes, water, construction debris, and physical damage.<br />

C. Comply with Manufacturer's rigging and installation instructions for unloading plumbing<br />

pumps and moving them to final location.<br />

1.05 DESIGN CRITERIA<br />

A. The drawings indicate sizes, profiles, connections, and dimensional requirements of<br />

plumbing pumps and are based on specific manufacturer types and models indicated.<br />

Pumps having equal performance characteristics by other manufacturers may be submitted<br />

on, provided that any deviations in dimensions and profiles and efficiencies do not change<br />

the design concept or intended performance, as judged by the Architect/Engineer.<br />

PART 2 – PRODUCTS<br />

2.01 GENERAL<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

221123 - 2 PLUMBING PUMPS