to equipment located in basements and hangs from ceiling under occupied spaces, the<br />

first three hangers shall have 0.75” deflection for pipe sizes up to and including 3”, 1.5”<br />

deflection for larger pipe sizes up to and including 6”, and 2.5” deflection for pipe sizes<br />

larger than 6”.) All other hangers and mounts shall have a minimum steel spring<br />

deflection of 0.75”.) Hangers shall be located as close to the overhead structure as<br />

practical.<br />

B. Equipment Room Seals: All piping passing through equipment room walls, floors or<br />

ceilings shall be protected against sound leakage by means of an acoustical wall seal as<br />

described in Specification M.<br />

C. Riser Isolation: Risers shall be suspended from Specification E hangers or supported by<br />

Specification C mountings, with the piping anchored or guided with Specification N<br />

anchors. Steel spring deflection shall be a minimum of 0.75” except in those expansion<br />

locations where additional deflection is required to limit load changes to plus or minus<br />

25% of the initial load.<br />

D. Pipe guides shall consist of a telescopic arrangement of two sizes of steel tubing separated<br />

by a minimum 1/2” thickness of 60 durometer neoprene. The height of the guides shall<br />

be preset with a shear pin to allow vertical motion due to pipe expansion or contraction.<br />

Shear pin shall be removable and reinsertable to allow for selection of pipe movement.<br />

Guides shall be capable of ± 1-5/8” motion, or as required to meet specific location<br />

requirements. Pipe guides shall be type VSG as manufactured by Mason Industries, Inc.<br />

E. Duct Isolation: All discharge runs for a distance of 50 feet from the connected equipment<br />

shall be isolated from the building structure by means of Specification F hangers or<br />

Specification C floor supports. Spring deflection shall be a minimum of 0.75”.<br />

F. Flexible Pipe Connections: All equipment that is supported by or mounted on vibration<br />

isolators shall be piped with flexible connections. Specification “K” or Specification “L”<br />

flexible connections shall be installed parallel to the equipment shaft insofar as practical<br />

and on the equipment side of isolation valves.<br />

G. Equipment Isolation: All mechanical equipment shall be mounted on vibration isolators to<br />

prevent the transmission of vibration and mechanically transmitted sound to the building<br />

structure. Vibration isolators shall be selected in accordance with the weight distribution so<br />

as to produce reasonably uniform deflection. Isolator types shall be as noted on the<br />

equipment schedule below.<br />

EQUIPMENT VIBRATION ISOLATION SCHEDULE:<br />

(Not all types of equipment listed below are necessarily used on this project.)<br />

EQUIPMENT TYPE<br />

Air Handling Units – Floor-Mounted<br />

Air Handling Units – Structure-Hung<br />

Condensers/Condensing Units<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

ISOLATOR SPECIFICATION<br />

Mount Type B;<br />

Connector Type K*<br />

Hanger Type D;<br />

Connector Type K*<br />

Mount Type C;<br />

Connector Type K<br />

STATIC DEFLECTION<br />

(INCHES)<br />

0.75<br />

23 0548 - 10 VIBRATION AND SEISMIC<br />

CONTROLS FOR HVAC PIPING<br />

AND EQUIPMENT