3.08 PREFABRICATED ROOFTOP EQUIPMENT SUPPORTS:<br />

A. Equipment Bases:<br />

1. Equipment base shall be solid top equipment base with stepped cant to match<br />

roof insulation. Base shall pitch to match roof pitch and provide level unit<br />

installation.<br />

2. Base shall be constructed of reinforced 18-gauge galvanized steel with all welded<br />

components, full mitered corners, factory installed 1-1/2” thick rigid fiberglass<br />

insulation, wood nailer, and galvanized steel counterflashing. Base shall be<br />

shipped as one piece.<br />

B. Equipment Rails:<br />

1. Equipment rail shall be constructed of 18-gauge galvanized steel shell, base plate,<br />

and counterflashing with factory installed wood nailer, fully mitered end sections,<br />

and stepped cant to match roof insulation. Rails shall pitch to match roof pitch<br />

and provide level installation.<br />

C. All supports shall be installed in accordance with manufacturer's recommendations.<br />

3.09 FLASHING AND SAFING:<br />

A. Flash and counterflash where mechanical equipment passes through weather- or waterproofed<br />

walls, floors, or roofs.<br />

B. Provide lead flashing around ducts and pipes passing from equipment rooms, installed<br />

according to manufacturer's data for sound control.<br />

3.10 METAL FABRICATION:<br />

A. Cut, drill, and fit miscellaneous metal fabrications for pipe anchors and equipment<br />

supports. Install and align fabricated anchors at indicated locations.<br />

B. Fit exposed connections together to form hairline joints. Field weld connections that<br />

cannot be shop welded because of shipping size limitations.<br />

C. Field Welding: Comply with AWS D1.1 for procedures of manual shielded metal-arc<br />

welding, appearance and quality of welds made, methods used in correcting welding<br />

work, and the following:<br />

3.11 ADJUSTING:<br />

1. Use materials and methods that minimize distortion and develop strength and<br />

corrosion resistance of base metals.<br />

2. Obtain fusion without undercut or overlap.<br />

3. Remove welding flux immediately.<br />

4. Finish welds at exposed connections so no roughness shows after finishing and<br />

contours at welded surfaces match adjacent contours.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

22 0529 - 12 HANGERS AND SUPPORTS FOR<br />

PLUMBING PIPING AND<br />

EQUIPMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!