Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

12/23/2011<br />

a. Within Building: Schedule 40 seamless black steel with 150 psi forged<br />

steel fittings and welded joints. Provide piping with machine-applied<br />

coating and wrapping in accordance with local code and utility company<br />

requirements. Provide cathodic protection as called for on the drawings.<br />

b. Outside of Building: Polyethylene (PE) pipe, as approved by local utility<br />

company and code authorities having jurisdiction.<br />

G. Equipment Drains, Condensate Drains and Overflows:<br />

1. Type “M” or “DWV” copper.<br />

H. Sump Pump Discharge:<br />

PART 3 – EXECUTION<br />

3.01 EXAMINATION:<br />

1. Schedule 40 galvanized steel with 125 psi cast iron or 150 psi malleable iron<br />

galvanized threaded fittings; or Type L, seamless, hard drawn copper tube with<br />

ANSI/ASME B16.22 wrought copper or bronze solder-joint pressure fittings.<br />

A. Verify all dimensions by field measurements. Verify that all water distribution piping may<br />

be installed in accordance with pertinent codes and regulations, original design, and the<br />

referenced standards.<br />

B. Examine rough-in requirements for plumbing fixtures and other equipment having water<br />

connections in order to verify actual locations of piping connections prior to installation.<br />

C. Do not proceed until unsatisfactory conditions have been corrected.<br />

3.02 PIPING INSTALLATION:<br />

A. General: Install pipes and pipe fittings in accordance with recognized industry practices<br />

which will achieve permanently leak-proof piping systems, capable of performing each<br />

indicated service without piping failure. Install each run with minimum joints and<br />

couplings, but with adequate and accessible unions for disassembly and<br />

maintenance/replacement of valves and equipment. Reduce sizes (where indicated) by use<br />

of reducing fittings. Make pipe runs straight and true. Align piping accurately at<br />

connections, within 1/16” misalignment tolerance.<br />

1. Comply with ANSI B31 Code for Pressure Piping.<br />

2. Electrical Equipment Spaces: Do not run piping through transformer vaults and<br />

other electrical or electronic equipment spaces and enclosures. Only piping<br />

serving this type of equipment space shall be allowed.<br />

3. Locations and Arrangements: Drawings (plans, schematics, and diagrams)<br />

indicate the general location and arrangement of piping systems. Locations and<br />

arrangements of piping take into consideration pipe sizing and friction loss,<br />

expansion, pump sizing, and other design considerations. So far as practical,<br />

install piping as indicated.<br />

4. Use fittings for all changes in direction and all branch connections.<br />

22 1116 - 9 BASIC PLUMBING PIPING