5. Corner Blocks: Glued and fastened in each of four top corners to maintain<br />

cabinet squareness and rigidity.<br />

M. <strong>Construction</strong> for drawer units as follows:<br />

1. Drawer Body: Not less than 3/8 inch thick vinyl faced particle board<br />

subfront, back, and sides. Provide box-type construction with subfront and<br />

back rabbeted into sides and secured with glue and mechanical fasteners.<br />

Exposed fronts fastened to subfront with mounting screws from interior of<br />

body. Drawer bottom of not less than 1/4 inch thick hardboard, set into<br />

rabbets in back, sides, and front.<br />

N. Millwork Hardware:<br />

1. Manufacturers<br />

a. Corbin Russwin Architectural Hardware (800-543-3658)<br />

b. Epco Engineered Products Co. (810-767-2050)<br />

c. Garcy Corp., (708-345-2500)<br />

d. Grant Hardware, Hettich America LP (800-777-1772)<br />

e. H.B. Ives, (203-294-4837)<br />

f. Knape & Vogt Manufacturing Co. (800-253-1561) (KV)<br />

g. Stanley Hardware, Div. of the Stanley Works (800-337-4393)<br />

h. Grass America (800-334-3512)<br />

O. Products: Coordinate finishes of exposed cabinet hardware with adjacent finish<br />

hardware as specified in Section 08 7100.<br />

2.6 SHOP FINISHING<br />

A. Finish architectural woodwork at fabrication shop. Defer only final touchup, cleaning,<br />

and polishing until after installation.<br />

B. Backpriming: Apply one coat of sealer or primer, compatible with finish coats, to<br />

concealed surfaces of woodwork. Apply two coats to back of paneling.<br />

PART 3 - EXECUTION<br />

3.1 INSTALLATION<br />

A. Before installation, condition woodwork to average prevailing humidity conditions in<br />

installation areas. Examine shop-fabricated work for completion and complete work as<br />

required, including removal of packing and backpriming.<br />

B. Grade: Install woodwork to comply with requirements for the same grade specified in<br />

Part 2 for fabrication of type of woodwork involved.<br />

C. Install woodwork level, plumb, true, and straight to a tolerance of 1/8 inch in 96<br />

inches. Shim as required with concealed shims.<br />

D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair<br />

damaged finish at cuts.<br />

Project No.: 10145 INTERIOR ARCHITECTURAL WOODWORK<br />

550 15th Street Dual Brand Hotel 064023 - 6<br />

19 March 2012