25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.3 ADJUSTING<br />

A. Adjust components and accessories for proper operation.<br />

3.4 CLEANING<br />

A. Clean surfaces according to manufacturer’s instruction after installation.<br />

B. Remove surplus materials packaging, rubbish and debris resulting from installation.<br />

Leave installation areas neat, clean, and ready for use.<br />

3.5 PROTECTION<br />

A. Provide final protection and maintain conditions in a manner acceptable to<br />

manufacturer and installer that ensure shower doors are without damage at the time<br />

of Substantial Completion.<br />

END OF SECTION 10 8240<br />

Project No.: 10145 SHOWER DOORS<br />

550 15th Street Dual Brand Hotel 108240 - 2<br />

19 March 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!