Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

e. Indicate the sizes, velocities and flow (CFM or gpm) for main and branch<br />

circuits and ducts. Include outside air intakes, exhaust air and relief air<br />

louvers.<br />

f. For rapid identification and for reporting purposes, all outlets shall be<br />

numbered. The same applies to fan-coil and/or heating/cooling units in<br />

hydronic systems.<br />

g. Clearly indicate thermostat locations and other special conditions needed<br />

by the TAB team in the field.<br />

4. Report Forms:<br />

a. Report forms shall be standard NEBB forms. Generate custom forms that<br />

contain the information required by this Section when a standard NEBB<br />

form does not exist for certain types of equipment. All design column<br />

spaces shall be fully filled out for this submittal. When additional<br />

information is required by this Section, it shall be written in on the NEBB<br />

form.<br />

b. If terminal airflows are to be determined by velocity readings, calculate<br />

and submit the terminal velocities using the manufacturer's K factors.<br />

c. Submit locations where pitot traverses of duct mains and branches are to<br />

be made. Determine the number of readings, calculate velocities and set<br />

up the duct pitot traverse test reports.<br />

3.02 GENERAL SYSTEM AND EQUIPMENT PROCEDURES:<br />

A. Balance all air and water flows at terminals to within +10% to –5% of design flow<br />

quantities. Notify Contractor/Engineer in writing of conditions detrimental to the proper<br />

completion of the test and balance work. Provide the Contractor/Architect/Engineer with a<br />

copy of the notification.<br />

B. Pressure relationships indicated on drawings shall take priority over air quantities.<br />

C. Mark equipment settings with paint, including damper control positions, balancing cocks,<br />

circuit setters, valve indicators, fan speed control settings and similar controls and devices,<br />

to show final settings at completion of test-adjust-balance work.<br />

D. Patch holes in insulation, ductwork and housings which have been cut or drilled for test<br />

purposes, in a manner recommend by the original installer.<br />

E. Measure, adjust and report equipment running motor amps and power factor, KW, rated<br />

motor amperage, listed motor power factor, voltage, and all other nameplate data.<br />

Perform these measurements for all equipment operational modes.<br />

F. Check and adjust equipment belt tensioning.<br />

G. Check keyway and setscrew tightness. Report any loose screws and notify Mechanical<br />

Contractor prior to equipment balancing.<br />

H. Record and include in report all equipment nameplate data.<br />

I. Verify that all equipment safety and operating controls are in place, tested, adjusted and<br />

set prior to balancing.<br />

23 0593 - 6 TESTING, ADJUSTING, AND<br />

BALANCING FOR HVAC