25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A. Examine areas and conditions under which interceptors are to be installed, as well as<br />

substrate which will support interceptors. Do not proceed with work until unsatisfactory<br />

conditions have been corrected in a manner acceptable to Installer.<br />

3.02 INSTALLATION OF INTERCEPTORS:<br />

A. General: Install interceptors as indicated, in accordance with manufacturer's installation<br />

instructions, and in compliance with applicable codes.<br />

B. Support: Anchor interceptors securely to substrate, and locate so adequate clearance is<br />

provided for removal of covers and sediment baskets. Set recessed units so top of cover is<br />

flush with finished floor.<br />

C. Piping: Connect inlet and outlet piping to interceptors.<br />

3.03 PROTECTION:<br />

A. Protect interceptors during remainder of construction period, to avoid clogging with<br />

construction materials and debris, and to prevent damage from construction debris and<br />

traffic.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 22 1323<br />

22 1323 - 3 SANITARY WASTE INTERCEPTORS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!