25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Woodwork shop drawings specified in Division 6 for fixtures installed in countertops and<br />

cabinets. Furnish templates for use in woodwork shop.<br />

C. Wiring Diagrams: Submit manufacturer’s electrical requirements and wiring diagrams for<br />

power supply to units. Clearly differentiate between portions of wiring that are factory<br />

installed and portions that are field installed.<br />

D. Color Charts: Submit manufacturer’s standard color charts for cabinet finishes and fixture<br />

colors.<br />

E. Maintenance Data: Submit maintenance data and spare parts list for each type of<br />

manufactured plumbing fixture, valve, and trim. Include this data, product data, and shop<br />

drawings in the Operating and Maintenance Manual in accordance with the requirements<br />

of Division 15.<br />

F. Submit certification of compliance with specified ANSI, UL, and ASHRAE requirements.<br />

G. Submit certification of compliance with performance verification requirements specified in<br />

this Section.<br />

1.05 DELIVERY, STORAGE, AND HANDLING:<br />

A. Store fixtures where environmental conditions are uniformly maintained within the<br />

manufacturer’s recommended temperature range to prevent damage.<br />

B. Store fixtures and trim in manufacturer’s original shipping containers. Do not stack<br />

containers or store in such a matter as to cause damage to the fixtures or trim.<br />

1.06 SEQUENCING AND SCHEDULING:<br />

A. Schedule rough-in installations with the installation of other building components.<br />

1.07 MAINTENANCE:<br />

A. Extra Stock:<br />

PART 2 – PRODUCTS<br />

1. Furnish special wrenches and other devices necessary for servicing plumbing<br />

fixtures and trim to Owner, with receipt, in a quantity of one device for each 10<br />

fixtures, minimum of one wrench and one device.<br />

2. For each type of faucet, furnish faucet repair kits complete with all necessary<br />

washers, springs, pins, retainers, packings, O-rings, sleeves, and seats in a<br />

quantity of one kit for each 40 faucets, minimum of one repair kit per faucet type.<br />

2.01 PLUMBING FIXTURES AND TRIM:<br />

A. Subject to compliance with requirements, provide products by one of the following<br />

approved manufacturers in each category. (The following list is not necessarily all-<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

22 4100 - 2 PLUMBING FIXTURES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!