3.03 PIPE APPLICATIONS:<br />

A. Use steel pipe with welded joints for 3/4 inch and larger.<br />

B. Use Type L, drawn copper tubing with wrought copper fittings and brazed joints for 2 inch<br />

and smaller, above ground, within building.<br />

3.04 PIPE INSTALLATIONS:<br />

A. General: Refer to Division 23 - "Basic Mechanical Materials and Methods" for basic piping<br />

installation instructions.<br />

B. Install supply, return, fill, and vent piping at a uniform grade of 1/4 inch in ten feet<br />

downward in the direction of the storage tank.<br />

C. Make changes in directions and branch connections using fittings.<br />

D. Make reductions in pipe sizes using eccentric reducer fitting install with the level side down.<br />

E. Install unions in pipes 2 inch and smaller, adjacent to each valve, at final connections<br />

each piece of equipment, and elsewhere as indicated. Unions are not required on flanged<br />

devices.<br />

F. Install dielectric unions where piping of dissimilar metals are joined.<br />

G. Install flanges on valves, apparatus, and equipment having 2-1/2 inch and larger<br />

connections.<br />

H. Install flexible connectors at inlet and discharge connections to pumps and other vibration<br />

producing equipment.<br />

I. Install strainers on the supply side of each control valve, pressure regulating valve, oil<br />

burner connection, and elsewhere as indicated. Install 3/4 inch NPS nipple and ball valve<br />

in blow down connection of strainers 2 inch and larger. Use same size nipple and valve<br />

as blow-off connection of strainer.<br />

J. Anchor piping to ensure proper direction of expansion and contraction. Install expansion<br />

loops and joints as indicated on the Drawings and specified in Division-23 Section<br />

"Expansion Compensation."<br />

K. Install pipe sleeve seals at foundation and basement wall penetrations, as specified in<br />

Division-23 Section: Basic Piping Materials and Methods."<br />

L. Seal pipe penetrations of fire barriers using fire barrier penetration sealers specified in<br />

Division-7 [079200] Section: "Joint Seallants."<br />

M. Hanger, supports, and anchors are specified in Division-23 Section "SUPPORTS AND<br />

ANCHORS." Conform to the table below for maximum spacing of supports:<br />

1. Steel Pipe:<br />

SIZE (NPS) SPACING IN FEET MIN. ROD SIZE-<br />

INCHES<br />

1/2 (horizontal) 5 3/8<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1113 - 9 FACILITY FUEL-OIL PIPING