Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

shall be so made that its several component parts will function together as a workable<br />

system and shall be left with all parts adjusted and in working order.<br />

1.39 PROJECT CLOSEOUT:<br />

A. In addition to the requirements specified in Division 1, complete the requirements listed<br />

below.<br />

B. The Contractor shall be responsible for the following Mechanical Checklist by performing<br />

and/or coordinating such items prior to applying for certification of substantial completion.<br />

1. Refer to individual specification sections for additional requirements.<br />

C. Mechanical Checklist:<br />

23 0010 - 17 BASIC MECHANICAL REQUIREMENTS