25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AIR CLEANING X X X X<br />

METAL DUCTWORK X X X X X<br />

NON-METAL DUCTWORK X X X X X X<br />

HVAC CASINGS X X X<br />

DUCTWORK ACCESSORIES X X X X<br />

SOUND ATTENUATORS X X X<br />

AIR OUTLETS & INLETS X X X<br />

AIR TERMINALS X X<br />

DIRECT DIGITAL CONTROL<br />

SYSTEMS X X X X X X<br />

ELECTRIC CONTROL<br />

SYSTEMS X X X X X X<br />

PNEUMATIC CONTROL<br />

SYSTEMS X X X X X X<br />

TESTING, ADJUSTING AND<br />

BALANCING X<br />

MECHANICAL<br />

COMMISSIONING X<br />

1 Warranty – 5 years<br />

2 Warranty Report/Warranty<br />

3 Kitchen Exhaust Hood<br />

PART 2 – PRODUCTS (NOT APPLICABLE)<br />

PART 3 – EXECUTION (NOT APPLICABLE)<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 23 0010<br />

23 0010 - 20 BASIC MECHANICAL REQUIREMENTS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!