B. Access: Provide access space around plumbing pumps for service as indicated, but in no<br />

case less than that recommended by manufacturer.<br />

C. Support:<br />

1. Install base-mounted pumps on minimum of 4” high concrete housekeeping pad,<br />

with anchor bolts inserted in place. Set and level pump, and grout under pump<br />

base with non-shrink grout.<br />

2. Install in-line pumps supported from piping system.<br />

3. Refer to Division 15 section "Vibration Control" for additional supporting and<br />

mounting requirements for plumbing pumps.<br />

D. Basins: Install sump pump basins in indicated locations, and connect to sewer lines.<br />

Brace interior of basin in accordance with manufacturer's instructions, to prevent distortion<br />

or collapse during concrete placement. Refer to Division 3 for concrete work. Set cover<br />

over basin, and fasten to top flange of basin. Install so that cover is flush with finished<br />

floor.<br />

E. Electrical Wiring: Install electrical devices furnished by manufacturer but not specified to<br />

be factory-mounted. Furnish copy of manufacturer's wiring diagram submittal to Electrical<br />

Installer.<br />

1. Power wiring, as required, shall be the responsibility of the electrical contractor.<br />

All wiring shall be performed per manufacturer’s instructions and applicable state,<br />

federal and local codes.<br />

2. Verify that electrical wiring installation is in accordance with manufacturer’s<br />

submittal and installation requirements of Division 16 sections. Do not proceed<br />

with equipment start-up until wiring installation is acceptable to equipment<br />

installer.<br />

F. Piping Connections: Refer to Division 15 plumbing piping sections. Provide piping,<br />

valves, accessories, gauges, supports, and flexible connections as indicated.<br />

3.03 ADJUSTING AND CLEANING:<br />

A. Alignment: Check alignment, and, where necessary, realign shafts of motors and pumps<br />

to within manufacturer’s recommended tolerances, in the presence of manufacturer’s<br />

service representative, prior to system start-up.<br />

B. Start-up: Lubricate pumps before start-up. Provide start-up in accordance with<br />

manufacturer's instructions.<br />

C. Cleaning: Clean factory-finished surfaces. Repair any marred or scratched surfaces with<br />

manufacturer's touch-up paint.<br />

3.04 DEMONSTRATION:<br />

A. The system manufacturer or factory-trained representative shall provide start-up of<br />

packaged pumping systems. This start-up shall include verification of proper installation,<br />

system initiation, adjustment and fine tuning. Start-up shall not be considered complete<br />

until the sequence of operation, including all alarms, has been sufficiently demonstrated to<br />

the Owner or Owner’s designated representative. This jobsite visit shall occur only after all<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

221123 - 6 PLUMBING PUMPS