I. The final carpet pattern, layout, edge binding locations shall be as directed and<br />

approved by Owner's Representative. All associated installation shall be by this<br />

Contractor.<br />

3.4 SEALING CUT EDGES<br />

3.5 SEAMING<br />

A. To prevent fraying and raveling at all seams and transition areas, a continuous<br />

bead of seam adhesive must be applied to the first edge where the face yarn enters<br />

the backing.<br />

B. On woven carpet, all cut edges at seams and transition areas must be secured<br />

with a latex seam adhesive immediately following the seam trimming.<br />

A. Install pad and carpet seams in accordance with manufacturer's published instructions.<br />

B. Locate pad seams at right angles to carpet seams. Where not possible to locate<br />

at right angles, locate pad seam minimum 6 inches away from carpet seams.<br />

Butt pad edges tightly together to form seams without gaps. Tape pad seams.<br />

C. Maintain uniformity of carpet direction and lay of pile. At doors, center seams<br />

under doors; do not place seams in traffic direction at doorways.<br />

D. Orcon Super 3S Wide tape will be used on all public area seams specifying hot<br />

melt tape.<br />

E. The seaming iron with heat shield must be of proper size, matching the hot melt<br />

tape being used.<br />

F. The proper head setting and exposure time must be used to assure proper transfer<br />

without creating damage to backing or pile yarn.<br />

G. Orcon Super 3S tape will be used in Guest Rooms and suites where seams are<br />

specified.<br />

H. Handsewing:<br />

1. An overhand stitch placed no more than 1/2 inch apart and no less than<br />

1/2 inch from the edge of the carpet is required.<br />

2. A latex coating must be applied over the stitching.<br />

3. The seam shall be allowed to dry at least eight (8) hours before stretching.<br />

I. Where conflicts between Owner’s requirements and manufacturer’s requirements<br />

occur, use Owner’s requirements.<br />

3.6 ACCESSORIES<br />

A. Provide carpet edge guard where edge of carpet is exposed; anchor guards to<br />

substrate. Edge guard shall be used in all doorways or openings where no sill is<br />

installed or as required.<br />

Project No.: 10145 SHEET CARPETING<br />

550 15th Street Dual Brand Hotel 096816 - 5<br />

19 March 2012