25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

E. Emergency-Exit Door Requirements: Comply with requirements of authorities having<br />

jurisdiction for automatic entrances serving as a required means of egress.<br />

1.6 PROJECT CONDITIONS<br />

A. Field Measurements: Verify actual dimensions of openings to receive automatic<br />

entrances by field measurements before fabrication.<br />

1.7 COORDINATION<br />

A. Templates: Obtain templates for doors, frames, and other work specified to be factory<br />

prepared for installing automatic entrances, and distribute to parties involved. Check<br />

Shop Drawings of other work to confirm that adequate provisions are made for<br />

locating and installing automatic entrances to comply with indicated requirements.<br />

B. Coordinate hardware with doors, frames, and related work to ensure proper size,<br />

thickness, hand, function, and finish. Coordinate hardware for automatic entrances<br />

with hardware required for rest of Project.<br />

C. Electrical System Roughing-in: Coordinate layout and installation of automatic<br />

entrances with connections to power supplies and access-control system.<br />

1.8 WARRANTY<br />

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to<br />

repair or replace components of automatic entrances that fail in materials or<br />

workmanship within specified warranty period.<br />

1. Failures include, but are not limited to, the following:<br />

a. Structural failures including, but not limited to, excessive deflection.<br />

b. Faulty operation of operators, controls, and hardware.<br />

c. Deterioration of metals, metal finishes, and other materials beyond<br />

normal weathering and use.<br />

2. Warranty Period: Two years from date of Substantial Completion.<br />

PART 2 - PRODUCTS<br />

2.1 MATERIALS<br />

A. Aluminum: Alloy and temper recommended by manufacturer for type of use and finish<br />

indicated.<br />

1. Extruded Bars, Rods, Profiles, and Tubes: ASTM B 221.<br />

2. Sheet and Plate: ASTM B 209.<br />

B. Steel Reinforcement: With manufacturer's standard corrosion-resistant primer<br />

complying with SSPC-PS Guide No. 12.00 applied immediately after surface<br />

Project No.: 10145 AUTOMATIC ENTRANCES<br />

550 15th Street Dual Brand Hotel<br />

19 March 2012<br />

084229 - 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!