C. The location of existing equipment, piping, ductwork, etc., shown on the drawings has<br />

been taken from existing drawings and is, therefore, only as accurate as that information.<br />

All existing conditions shall be verified from field measurements with necessary adjustment<br />

being made to the drawing information.<br />

D. If asbestos material, in any form, is discovered by this contractor in the process of his work,<br />

he shall report such occurrence to the Architect or Engineer immediately. The Architect or<br />

Engineer will determine the action to be taken for the asbestos removal, which is not a part<br />

of the work to be done under this Division.<br />

1.32 WARRANTIES:<br />

A. Refer to the Division 1 for procedures and submittal requirements for warranties.<br />

B. Compile and assemble the warranties specified in Division 15 into the Operating and<br />

Maintenance Manual.<br />

C. Provide complete warranty information for each item, which shall include name of product<br />

or equipment; date of beginning of warranty or bond; duration of warranty or bond; and<br />

names, addresses, and telephone numbers of manufacturing/servicing personnel as well<br />

as procedures for filing a claim and obtaining warranty services.<br />

D. The Contractor shall warrant all materials, workmanship and the successful operation of<br />

all equipment and apparatus installed for a period of one (1) year from the date of final<br />

acceptance of the entire work as identified in the General Conditions, and shall guarantee<br />

to repair or replace at his own expense any part of the apparatus that may show defect<br />

during that time, provided such defect is, in the opinion of the Architect/Engineer, due to<br />

imperfect material or workmanship and not due to carelessness or improper use on the<br />

part of the owner/operator.<br />

E. Include repair of damage to any part of the premises caused by water and gas leaks or<br />

breaks in piping, fixtures or equipment furnished and installed under this Division which<br />

occur within the warranty period.<br />

F. Include repair of damage to or replacement of any part of the equipment and replacement<br />

of refrigerant and oil caused by leaks or breaks in piping and equipment within the<br />

warranty period.<br />

1.33 OWNER ACCEPTANCE:<br />

A. At the time of acceptance of the building by the Owner, all Division 23 systems shall be in<br />

first-class operating condition in all respects and satisfactory to the Architect/Engineer.<br />

1.34 CLEANING OF EQUIPMENT, MATERIALS AND PREMISES:<br />

A. Clean equipment and materials thoroughly. Leave surfaces to be painted smooth and<br />

clean, ready for painters. Clean entire premises of unused materials, rubbish, debris,<br />

grease spots and dirt left by each Subcontractor. Remove, clean and replace pipeline<br />

strainers after systems have been in operation for a period of thirty (30) calendar days.<br />

B. Provide detergents, solvents and other cleaning agents that are compatible with materials<br />

used in fabrication of systems. They shall not adversely affect materials or mechanisms in<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 0010 - 15 BASIC MECHANICAL REQUIREMENTS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!