25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A. General: The Drawings indicate valve types, locations, and arrangements.<br />

B. Shut-off duty: Use gas cocks.<br />

3.06 VALVE INSTALLATIONS:<br />

A. Install valves in accessible locations, protected from physical damage. Tag valves with a<br />

metal tag attached with a metal chain indicating the piping systems supplied.<br />

B. Install a gas cock upstream of each gas pressure regulator. Where two gas pressure<br />

regulators are installed in series in a single gas line, a manual valve is not required at the<br />

second regulator.<br />

C. Install pressure relief or pressure limiting devices so they can be readily operated to<br />

determine if the valve is free, tested to determine the pressure at which they will operate,<br />

and examined for leakage when in the closed position. Pipe atmospheric vent to outdoors.<br />

D. Solenoid valves shall be mounted with the solenoid in the vertical upright position only.<br />

1. Electrical wiring for solenoid valves is specified in Division 16. Coordinate<br />

electrical requirements and connections.<br />

E. Valves shall be installed with unions or other means to facilitate removal or repair without<br />

disassembly of connecting piping.<br />

F. Gas Safety Valves:<br />

1. Install gas safety valves in wall boxes [exposed].<br />

2. Coordinate electrical requirements with Division 16 contractor. Provide neoprene<br />

grommets for all piping and electrical conduit entering and existing cabinets.<br />

3.07 TERMINAL EQUIPMENT CONNECTIONS:<br />

A. Install gas cock upstream and within 6 feet of gas appliance. Install a union or flanged<br />

connection downstream from the gas cock to permit removal of controls.<br />

B. Sediment Traps: Install a tee fitting with the bottom outlet plugged or capped as close to<br />

the inlet of the gas appliance as practical. Drip leg shall be a minimum of 3 pipe<br />

diameters in length.<br />

C. Flexible Hose Gas Connectors: For use connecting to vibrating equipment; corrugated<br />

Type 304 stainless steel flexible pipe with stainless steel braid.<br />

3.08 ELECTRICAL BONDING AND GROUNDING:<br />

A. Install above-ground portions of gas piping systems, upstream from equipment shutoff<br />

valves, electrically continuous and bonded to a grounding electrode in accordance with<br />

NFPA 70, "National Electrical Code."<br />

B. Do not use gas piping as a grounding electrode.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 1123 - 7 FACILITY NATURAL-GAS PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!