25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Install escutcheons with ID to closely fit around pipe, tube, and insulation of piping and with OD<br />

that completely covers opening.<br />

C. Furnish pipe Escutcheons with nickel or chrome finish for occupied areas, prime paint finish for<br />

unoccupied areas.<br />

D. Escutcheons for Moist Areas: Provide cast brass or sheet brass, solid or split hinged.<br />

E. Install floor plates for piping penetrations of equipment-room floors.<br />

F. Install floor plates with ID to closely fit around pipe, tube, and insulation of piping and with OD<br />

that completely covers opening.<br />

1. New Piping: One-piece, floor-plate type.<br />

2. Existing Piping: Split-casting, floor-plate type.<br />

3.2 FIELD QUALITY CONTROL<br />

A. Replace broken and damaged escutcheons and floor plates using new materials.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 23 0518<br />

23 0518 - 2 ESCUTCHEONS FOR HVAC<br />

PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!