25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.7 ADJUSTING<br />

A. Stretch-In Installation: Restretch carpet sixty days after Substantial Completion,<br />

as directed by Owner.<br />

3.8 CLEANING AND PROTECTION<br />

A. Comply with CRI 104, Section 15, “Protection of Indoor Installation”.<br />

B. Remove and dispose of debris and unusable scraps daily.<br />

C. Vacuum carpet daily using commercial machine with face-beater element. Remove<br />

spots and replace carpet where spots cannot be removed. Remove any<br />

protruding face yarn using sharp scissors. Knock down tacks at entries to baths<br />

and guest rooms (to protect feet).<br />

D. Maintenance Materials: Deliver specified overrun (if any) and usable scraps of<br />

carpet to Owner's designated storage space, properly packaged (paper<br />

wrapped) and identified. Usable scraps are defined to include roll ends of less<br />

than 9'-0" length, and 3'-0" wide. Dispose of smaller pieces as "construction<br />

waste".<br />

E. Protect carpet against damage from construction operations and placement of<br />

equipment and fixtures during the remainder of construction period. Use protection<br />

methods indicated or recommended in writing by carpet manufacturer.<br />

END OF SECTION 09 6816<br />

Project No.: 10145 SHEET CARPETING<br />

550 15th Street Dual Brand Hotel 096816 - 6<br />

19 March 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!