25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.03 FIELD QUALITY CONTROL:<br />

A. Testing: Upon completion of installation, pressure-test water tanks hydrostatically to<br />

ensure structural integrity and freedom from leaks, in accordance with applicable sections<br />

of the ASME Boiler and Pressure Vessel Code.<br />

3.04 CLEANING:<br />

A. Flushing: Flush water tanks upon completion of installation in accordance with<br />

manufacturer’s instructions, and comply with applicable health codes.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 22 1223<br />

22 1223 - 3 DOMESTIC WATER STORAGE<br />

TANKS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!