25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 1 – GENERAL<br />

1.01 DESCRIPTION OF WORK:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

SECTION 23 1113<br />

FACILITY FUEL-OIL PIPING<br />

A. This Section includes fuel oil piping system and equipment, including:<br />

1. Piping, fittings and specialties.<br />

2. Oil transfer equipment.<br />

3. Oil storage tanks and accessories.<br />

B. Related Sections; The following sections contain requirements that relate to this section:<br />

1.02 DEFINITIONS:<br />

1. Division 2 Section "Earthwork" for excavation, trenching and backfilling for<br />

underground piping.<br />

2. Division 3 Section "Concrete Work" for cast-in-place concrete, reinforcing and<br />

formwork for equipment pads.<br />

3. Division 23 Section "Meters and Gauges" for oil supply and return line<br />

thermometers, and pressure and vacuum gauges.<br />

4. Division 25 Section "Mechanical Identification" for labeling and identification of<br />

fuel oil piping and transfer equipment.<br />

5. Division 25 Section "Mechanical Insulation" for pipe insulation for underground oil<br />

piping.<br />

A. Pipe sizes used in this Specification are Nominal Pipe Size (NPS).<br />

1.03 SUBMITTALS:<br />

A. Product data for the following products.<br />

1. All valves including special duty valves.<br />

2. Fuel oil piping.<br />

3. Oil submersible and transfer pumps. Include performance curves, electrical<br />

characteristics and specified accessories.<br />

4. Oil piping specialties.<br />

B. Shop drawings detailing fabrication and installation of oil storage tanks and accessories.<br />

Detail equipment assemblies and indicating dimensions, weights, loadings, required<br />

clearances, method of field assembly, components and location and size of each field<br />

connection.<br />

C. Wiring diagrams detailing wiring for power and control systems; differentiating between<br />

manufacturer-installed wiring and field-installed wiring.<br />

23 1113 - 1 FACILITY FUEL-OIL PIPING

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!