PART 1 – GENERAL<br />

1.01 RELATED DOCUMENTS:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

SECTION 23 0010<br />

BASIC MECHANICAL REQUIREMENTS<br />

A. Drawings and general provisions of the Contract, including the General and<br />

Supplementary Conditions, and Division 01 Conditions and specification sections, apply to<br />

this section.<br />

B. Related Sections: Refer to all sections in Division 21, 22, 23, and 26 specifications and<br />

drawings.<br />

1.02 DESCRIPTION OF WORK:<br />

A. The work included under this Division, consists of furnishing all materials, supplies,<br />

equipment, tools, transportation, and facilities, and performing all labor and services<br />

required in connection with, or properly incidental to, mechanical work as described in<br />

Division 23 Sections of the Specifications, as shown on the Contract Drawings, or<br />

reasonably implied there-from.<br />

B. While all work is in progress, except for short designated intervals during which<br />

connections are to be made, continuity of service to all existing systems shall be<br />

maintained. Contractor shall be directly responsible for any interruptions to service and<br />

shall be required to repair any damages to existing systems which are caused by his<br />

operations.<br />

C. Any work which will affect the Building Occupants, including, but not limited to, work<br />

which generates excessive noise, dust, smoke, or inconvenience to Building Occupants,<br />

shall be performed after business hours, unless prior approval has been obtained from the<br />

Building Manager.<br />

D. The Contractor shall coordinate and cooperate with Owner at all times for all new-toexisting<br />

connections, system shutdowns, restart-up, and flushing and filling of both new<br />

and existing affected systems.<br />

E. Provide temporary piping services where required to maintain existing areas operable, as<br />

shown on the drawings.<br />

1.03 WORK NOT INCLUDED:<br />

A. Painting of exposed piping and unfinished portions of fixtures and equipment, except as<br />

otherwise specified within this Division.<br />

B. Concrete work including miscellaneous metal in connection with foundations, pits, sumps,<br />

and/or concrete housekeeping pads under heat exchangers, pumps, and other<br />

mechanical equipment; however, furnish template for spacing and sizes of concrete pads<br />

and anchor bolts under the Mechanical Sections of these Specifications.<br />

23 0010 - 1 BASIC MECHANICAL REQUIREMENTS