7. Tightening bolts shall be equipped with lockwashers at the movable cover to facilitate<br />

opening and closing of the unit from the fixed cover. Bearing Box Washers shall be<br />

supplied at the fixed cover on all units greater than 50" in height.<br />

8. Plate and carrying bar design shall permit the removal of any plate in the plate pack<br />

without the need to remove any other plates.<br />

9. Tightening bolts shall be equipped with captive nuts at the fixed cover and threaded nuts at<br />

the movable cover. Welding of the nut to the tightening bolt is prohibited. Tightening bolts<br />

shall be coated with a rust preventative lubricant. In addition, a protective sleeve shall be<br />

installed on all exposed threads.<br />

10. The bolting system shall be designed such that only four (4) tightening bolts are required<br />

for 80% of the pressure plate travel during opening and closing of the unit. This is required<br />

to minimize maintenance downtime.<br />

11. The plate pack shall be covered with a shroud in accordance with OSHA. Preference shall<br />

be given to stainless steel.<br />

12. The mechanical alignment system of the plates shall be designed to minimize horizontal<br />

(perpendicular to carrying bar) and vertical movement of the plates. This alignment system<br />

shall be built into the carrying and guide bars as well as pressed into the plate pattern. No<br />

alignment with the use of the gaskets is permitted.<br />

13. Lifting devices shall be supplied on all units with 6" ports or larger. These shall be designed<br />

to support one and a half times the unit's weight. Instructions for lifting shall be clearly<br />

visible on the unit.<br />

C. Surface Preparation and Painting<br />

1. The following requirements shall be adhered to for all carbon steel components excluding<br />

tightening bolts and fasteners:<br />

2. Preblast Preparation<br />

a. Rough and/or sharp edges shall be broken with a power grinder.<br />

b. All threaded openings shall be sealed.<br />

c. All surfaces shall be solvent cleaned per SSPC requirement SP-1.<br />

3. Blasting Requirements<br />

a. All steel surfaces to be coated shall be cleaned by blasting metal in accordance with<br />

SSPC requirement SP- IO.<br />

b. The surface anchor profile shall adhere to the painting manufacturer's<br />

recommendations and shall be recorded.<br />

4. Painting Application Requirements<br />

D. Connections<br />

a. Painting shall commence within four hours of blasting.<br />

b. Surfaces shall be clean, free from dust, and dry before painting or application of<br />

any coating.<br />

c. All paints shall be furnished mixed and applied in accordance with the<br />

manufacturer's recommendations.<br />

d. The finish coat shall be inspected for adequate total dry film thickness over its entire<br />

surface.<br />

1. Connections equal to or less than 2" shall be NPT type.<br />

Project No.: 10145<br />

550 15th Street Dual Brand Hotel<br />

03/16/2012<br />

23 5700 - 4 HEAT EXCHANGERS FOR HVAC