25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Fan-Powered Boxes – Structure-Hung<br />

Floor-Mounted Fans<br />

Fan Heads and Axial or Centrifugal Fans<br />

(where air thrust exceeds 10% of equipment weight)<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

Hanger Type D;<br />

Connector Type K**<br />

Mount Type B***;<br />

Base Type G<br />

0.75<br />

1.50<br />

Thrust Restraint Type X 1.50<br />

Structure-Hung Fans Hanger Type D 0.75<br />

Floor-Mounted Pumps<br />

(Slab on Grade)<br />

Floor-Mounted Pumps<br />

Above/Below Occupied Spaces<br />

Structure-Hung Pumps<br />

Rooftop HVAC Units<br />

Unit Heaters<br />

* Omit if internal isolation is provided.<br />

** Omit for FPB without hydronic coil.<br />

*** Use type C mount for outdoor, wind-loaded installations.<br />

3.05 EXAMINATION OF RELATED WORK:<br />

Mount Type A;<br />

Connector Type K<br />

Base Type J; Spring Type B;<br />

Connector Type K<br />

Hanger Type D<br />

Connector Type K<br />

Mount Type Y;<br />

Connector Type K<br />

Hanger Type D1;<br />

Connector Type K<br />

A. Installer of vibration isolation work shall observe installation of other work related to<br />

vibration isolation work, including work connected to vibration isolation work; and, after<br />

completion of other related work (but before equipment start-up), shall furnish written<br />

report to Engineer listing any observed inadequacies which could prevent proper operation<br />

and performance of vibration isolation work. Report shall cover, but not necessarily be<br />

limited to, the following:<br />

0.75<br />

1.50<br />

0.75<br />

0.75<br />

1. Equipment installations (performed as work of other sections) on vibration<br />

isolators.<br />

2. Piping connections, including flexible connections.<br />

3. Ductwork connections, including provisions for flexible connections.<br />

4. Passage of piping and ductwork, which is to be isolated, through walls and floors.<br />

B. Do not start up equipment until inadequacies have been corrected.<br />

3.06 ADJUSTING AND CLEANING:<br />

A. Clean each vibration control unit, and verify that each is working freely and that there is<br />

no dirt or debris in immediate vicinity of unit that could possibly short- circuit unit isolation.<br />

3.07 DEFLECTION MEASUREMENTS:<br />

23 0548 - 11 VIBRATION AND SEISMIC<br />

CONTROLS FOR HVAC PIPING<br />

AND EQUIPMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!