25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

C. Specification “C”, Flexible Fiberglass Equipment Insulation: ASTM C-553, Type I, 1.5 lb.<br />

per cu. ft. density. “k” factor shall be a maximum of 0.45 at 250° F mean temperature,<br />

450° F temperature limit.<br />

D. Specification “D”, Calcium Silicate Equipment Insulation: ASTM C-533, Type I, block-type.<br />

“k” factor shall be a maximum of 0.87 at 1000° F mean temperature, compression<br />

strength of 200 psi for 5% compression, and minimum transverse strength 60 psi.<br />

E. Specification “E”, Flexible Closed Cell Elastomeric Insulation: ASTM C-534, Type I. “k”<br />

value shall be a maximum of 0.27 at 75° F mean temperature, 220° F temperature limit,<br />

and water vapor permeability of 0.10 perm or less.<br />

F. Jacketing Material for Equipment Insulation: Provide presized glass cloth jacketing<br />

material, not less than 7.8 ounces per square yard, or metal jacket at Installer's option,<br />

except as otherwise indicated.<br />

G. Equipment Insulation Compounds: Provide adhesives, cements, sealers, mastics and<br />

protective finishes as recommended by insulation manufacturer for the applications<br />

indicated.<br />

H. Equipment Insulation Accessories: Provide staples, bands, wire, wire netting, tape, corner<br />

angles, anchors and stud pins as recommended by insulation manufacturer for the<br />

applications indicated.<br />

PART 3 – EXECUTION<br />

3.01 INSPECTION:<br />

A. Examine areas and conditions under which mechanical insulation is to be installed. Do<br />

not proceed with work until unsatisfactory conditions have been corrected in a manner<br />

acceptable to Installer.<br />

B. Workmanship shall be first class and of the highest quality. Poor installation or<br />

unacceptable appearance, as determined by the Engineer, shall be due cause to reject the<br />

entire project in whole, and retainage will be withheld until corrective action is completed<br />

to the Engineer's satisfaction.<br />

3.02 PIPING SYSTEM INSULATION:<br />

A. All portions of the following piping systems shall be insulated with Specification “A”<br />

Fiberglass Piping Insulation. See Table 1 for minimum insulation thicknesses required.<br />

1. Piping systems to be insulated:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

a. Domestic cold water piping.<br />

b. Non-potable cold water piping.<br />

c. Domestic chilled water piping.<br />

d. Domestic hot water: supply, recirculated and tempered.<br />

e. Interior horizontal storm water and overflow drain piping below roofline,<br />

including roof drain bodies.<br />

f. Pumped storm water piping exposed to weather, horizontal and vertical.<br />

22 0719 - 4 PLUMBING INSULATION

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!