PART 3 - EXECUTION<br />

3.1 EXAMINATION<br />

A. Examine areas and conditions, with Installer present, for compliance with requirements for<br />

installation tolerances and other conditions affecting performance of the Work.<br />

B. Examine roughing-in for hot-water and chilled water piping systems to verify actual locations of<br />

piping connections before equipment installation.<br />

C. Examine walls, floors, and roofs for suitable conditions where dehumidification units will be<br />

installed.<br />

D. Proceed with installation only after unsatisfactory conditions have been corrected.<br />

3.2 INSTALLATION<br />

A. Equipment Mounting: Comply with requirements for vibration isolation devices specified in<br />

Section 230548 "Vibration and Seismic Controls for HVAC Piping and Equipment."<br />

1. Minimum Deflection: 1/4 inch (6 mm).<br />

B. Install continuous-thread hanger rods and spring hangers with vertical-limit stop of size required<br />

to support weight of dehumidification unit.<br />

1. Comply with requirements for vibration isolation devices specified in Section 230548<br />

"Vibration and Seismic Controls for HVAC Piping and Equipment." Fabricate brackets or<br />

supports as required.<br />

2. Comply with requirements for hangers and supports specified in Section 230529 "Hangers<br />

and Supports for HVAC Piping and Equipment."<br />

3.3 CONNECTIONS<br />

A. Where piping is installed adjacent to dehumidification units, allow space for service and<br />

maintenance of dehumidification units.<br />

B. Connect piping to dehumidification units mounted on vibration isolators with flexible connectors.<br />

C. Connect condensate drain pans using minimum NPS 1-1/4 (DN 32) copper tubing. Extend to<br />

nearest equipment or floor drain. Construct deep trap at connection to drain pan, and install<br />

cleanout at changes in direction.<br />

D. Refrigerant Piping: Comply with requirements in Section 232300 "Refrigerant Piping." Connect to<br />

supply and return coil tappings with shutoff valve and union or flange at each connection.<br />

E. Hot-Water Piping: Comply with requirements in Section 232113 "Hydronic Piping." Connect to<br />

supply coil tappings with shutoff valve, return coil tappings with balancing valve, and union or<br />

flange at each connection.<br />

F. Steam and Condensate Piping: Comply with requirements in Section 232213 "Steam and<br />

Condensate Heating Piping." Connect with shutoff valve and union or flange.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 8416 - 9 MECHANICAL DEHUMIDIFICATION<br />

UNITS