A. Hanger Adjustment: Adjust hangers to distribute loads equally on attachments and to<br />

achieve indicated slope of pipe.<br />

B. Touch-Up Painting: Immediately after erection of anchors and supports, clean field welds<br />

and abraded areas of shop paint, and paint exposed areas with same material as used for<br />

shop painting to comply with SSPC-PA-1 requirements for touch-up of field-painted<br />

surfaces.<br />

1. Apply by brush or spray to provide a minimum dry film thickness of 2.0 mils.<br />

C. For galvanized surfaces, clean welds, bolted connections and abraded areas, and apply<br />

galvanizing repair paint to comply with ASTM A-780.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

END OF SECTION 22 0529<br />

22 0529 - 13 HANGERS AND SUPPORTS FOR<br />

PLUMBING PIPING AND<br />

EQUIPMENT