25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

A. General: Provide engraving stock melamine plastic laminate, complying with FS L-P-387,<br />

in the sizes and thicknesses indicated, engraved with engraver's standard letter style of the<br />

sizes and wording indicated, black with white core (letter color) except as otherwise<br />

indicated, punched for mechanical fastening except where adhesive mounting is necessary<br />

because of substrate.<br />

B. Thickness: 1/8”, except as otherwise indicated.<br />

C. Fasteners: Self-tapping stainless steel screws, except contact-type permanent adhesive<br />

where screws cannot or should not penetrate the substrate.<br />

2.11 PLASTICIZED TAGS:<br />

A. General: Manufacturer's standard pre-printed or partially pre-printed accident-prevention<br />

tags, of plasticized card stock with matt finish suitable for writing, approximately 3-1/4" x<br />

5-5/8”, with brass grommets and wire fasteners, and with appropriate pre-printed<br />

wording including large-size primary wording (such as DANGER, CAUTION, DO NOT<br />

OPERATE).<br />

2.12 LETTERING AND GRAPHICS:<br />

A. General: Coordinate names, abbreviations and other designations used in mechanical<br />

identification work with corresponding designations shown, specified, scheduled and<br />

approved by the Owner/Engineer. Provide numbers, lettering and wording as indicated<br />

and approved by the Owner/Engineer for proper identification and<br />

operation/maintenance of mechanical systems and equipment.<br />

B. Multiple Systems: Where multiple systems of same generic name are shown and specified,<br />

provide identification which indicates individual system number as designated on the<br />

drawings or schedule as well as service.<br />

PART 3 – EXECUTION<br />

3.01 GENERAL INSTALLATION REQUIREMENTS:<br />

A. Coordination: Where identification is to be applied to surfaces which require insulation,<br />

painting or other covering or finish, including valve tags in finished mechanical spaces,<br />

install identification after completion of covering and painting. Install identification prior to<br />

installation of acoustical ceilings and similar removable concealment.<br />

3.02 DUCTWORK IDENTIFICATION:<br />

A. General: Identify air supply, return, exhaust, intake and relief ductwork and duct access<br />

doors with duct markers; or provide stenciled signs and arrows, showing ductwork service<br />

and direction of flow, in black or white (whichever provides the most contrast with<br />

ductwork color). Identification in an existing building shall match the method which exists<br />

in the building.<br />

B. Location: In each space where ductwork is exposed or concealed only by a removable<br />

ceiling system, locate signs near points where ductwork originates or continues into<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 0553 - 5 IDENTIFICATION FOR HVAC PIPING<br />

AND EQUIPMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!