Item Specification Thickness<br />

Pumps, tanks, and all<br />

cold equipment not<br />

factory insulated.<br />

Cold water storage<br />

tanks<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

Vapor Seal<br />

Required<br />

B 2" Yes<br />

B 2" Yes<br />

Air separators B 2"<br />

Boilers not factory<br />

insulated<br />

Yes (only on chilled<br />

water)<br />

A 2" No<br />

Hot water storage tanks A 2" No<br />

Heat exchangers A 3" No<br />

Condensate pumps A 2" No<br />

3.04 INSTALLATION OF PIPING INSULATION:<br />

A. General: Install insulation products in accordance with manufacturer's written instructions<br />

and in accordance with recognized industry practices, to ensure that insulation serves its<br />

intended purpose.<br />

B. Install insulation on piping systems subsequent to installation of heat tracing, testing, and<br />

acceptance of tests.<br />

C. Install insulation materials with smooth and even surfaces. Insulate each continuous run of<br />

piping with full-length units of insulation, with single cut piece to complete run. Do not use<br />

cut pieces or scraps abutting each other.<br />

D. Clean and dry pipe surfaces prior to insulating. Butt insulation joints firmly together to<br />

ensure complete and tight fit over surfaces to be covered.<br />

E. Where factory premolded, one-piece, PVC insulated fitting covers are to be used, the<br />

proper factory precut insulation shall be applied to the fitting using two layers for pipe<br />

temperatures above 250°F or below 35°F, and single-layer insulation for pipe<br />

temperatures between 35°F and 250°F. The ends of the insulation shall be tucked snugly<br />

into the throat of the fitting and the edges adjacent to the pipe covering, tufted and tucked<br />

in, fully insulating the pipe fitting. Covers shall overlap the adjoining pipe insulation and<br />

jackets, and on cold pipes shall be sealed at all seam edges with vapor barrier adhesive.<br />

The circumferential edges of all covers shall be sealed with pressure sensitive type. The<br />

tape shall overlap the jacket and cover by at least 1”.<br />

22 0719 - 6 PLUMBING INSULATION