C. Fasten plumbing fixtures securely to supports or building structure. Secure supplies behind<br />

or within wall construction to provide rigid installation. Provide rigid bracing for each flush<br />

valve stub-out.<br />

D. Set shower receptors and mop basins on a leveling bed of cement grout.<br />

E. Install a stop valve in an accessible location in the water connection to each fixture.<br />

F. Install escutcheons at each wall, floor, and ceiling penetration in exposed finished<br />

locations and within cabinets and millwork.<br />

G. Seal fixtures to walls, countertops and floors using General Electric silicone sealant or<br />

equal. Match sealant color to fixture color.<br />

H. Visible parts of fixture brass and accessories shall be chrome-plated. (Trim with external<br />

finish of chrome-plated plastic shall not be used.)<br />

I. Install hose end faucets and hose connections with vacuum breakers.<br />

J. Provide chrome-plated anchor bolts and washers for all lavatories and china bolt caps for<br />

all floor-mounted water closets. Solidly attach floor-mounted water closets to floor with<br />

hex expansion shield of cast iron closet flanges.<br />

3.03 ADA ACCESSIBILITY:<br />

A. Review Mechanical and Architectural drawings to determine fixtures requiring ADA<br />

accessibility. Notify Architect/Engineer of any physical conflicts preventing full dimensional<br />

compliance prior to beginning work.<br />

B. Comply with the installation requirements of ANSI A117.1 and Public Law 90-480 with<br />

respect to plumbing fixtures for the physically handicapped. Arrange flush valve/flush tank<br />

handles with proper orientation to meet ADA requirements.<br />

3.04 FIELD QUALITY CONTROL:<br />

A. Test fixtures to demonstrate proper operation upon completion of installation and after<br />

units are water pressurized. Replace malfunctioning units, then retest.<br />

B. Inspect each installed unit for damage. Replace damaged fixtures.<br />

3.05 ADJUSTING:<br />

A. Adjust water pressure at drinking fountains, faucets, shower valves, and flush valves to<br />

provide proper flow and stream.<br />

B. Replace washers of leaking or dripping faucets and stops.<br />

3.06 CLEANING:<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

22 4100 - 5 PLUMBING FIXTURES