A. After installation is complete, measure the harmonic voltage and current distortion of each<br />

VFD with the drive assembly in bypass mode, with the VFD running at 50% operating<br />

speed, and with the VFD running at highest operating speed. Take measurements on<br />

each phase (L-L) on the line side (input terminals) of the VFD.<br />

B. If measurements exceed the limits as specified in Part 2, install corrective reactors or filters<br />

at no additional cost to the owner, and retake measurements after corrective equipment is<br />

installed.<br />

C. Include all measurements (before and after installation of corrective equipment) in the<br />

harmonic distortion report. Provide the Engineer with a copy of the harmonic distortion<br />

report.<br />

D. The Harmonic Distortion Test and Report shall be conducted by an approved independent<br />

testing agency.<br />

3.05 VFD NOISE TEST:<br />

A. Measure the dBA sound level of the motor with the drive in bypass mode and with the<br />

drive operating from 25% to 100% speed output.<br />

B. If the measurements exceed the limits specified in part 2, correct as required at no cost to<br />

the Owner, and retake measurements.<br />

C. Report all tests to the Engineer.<br />

3.06 VFD INDUCED SHAFT VOLTAGE TEST:<br />

A. After installation is complete and system is operating under normal conditions, measure<br />

and report any voltage potential between the motor shaft and the motor frame. This test<br />

may occur anytime between substantial completion of the project and the end of the<br />

overall project warranty period. Report findings to the Engineer. Costs for any corrective<br />

measures required shall be included in the bid.<br />

3.07 MECHANICAL WIRING:<br />

A. Provide all temperature control wiring, all interlock wiring, and equipment that is to be<br />

provided under this Division unless specifically shown on Electrical drawings.<br />

B. All line voltage interlock and control wiring shall be not less than No. 14 insulated, color<br />

coded wire in conduit or raceway.<br />

C. Electrical wiring in connection with the automatic temperature control system, where shown<br />

on the Division 26 drawings, shall be performed by the Electrical Contractor. All other<br />

wiring, including 120V required for proper operation of the automatic temperature control<br />

system, shall be performed by the Mechanical Contractor.<br />

3.08 INSTALLATION COORDINATION:<br />

A. Furnish equipment requiring electrical connections to operate properly and to deliver full<br />

capacity at electrical service available.<br />

Project No.: 10145<br />

550 15 th Street Dual Brand Hotel<br />

03/16/2012<br />

23 0513 - 12 MECHANICAL/ELECTRICAL REQ.<br />

FOR MECHANICAL EQUIPMENT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!