25.12.2012 Views

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

substitution request - Alliance Construction Solutions

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PART 1 - GENERAL<br />

1.01 SUMMARY<br />

SECTION 09 2400<br />

CEMENT PLASTERING<br />

A. Section Includes: Exterior fiberglass reinforced portland cement plasterwork (stucco) on<br />

metal lath.<br />

1.02 ACTION SUBMITTALS<br />

A. Product Data: For each type of product indicated.<br />

B. Shop Drawings: Show locations and installation of control and expansion joints including<br />

plans, elevations, sections, details of components, and attachments to other work.<br />

C. Samples: For each type of factory-prepared finish coat indicated.<br />

1.03 QUALITY ASSURANCE<br />

A. Mockups: Before plastering, install mockups of at least 100 sq. ft. in surface area to<br />

demonstrate aesthetic effects and set quality standards for materials and execution.<br />

1. Approved mockups may become part of the completed Work if undisturbed at time<br />

of Substantial Completion.<br />

1.04 PROJECT CONDITIONS<br />

A. Comply with ASTM C 926 requirements.<br />

B. Factory-Prepared Finishes: Comply with manufacturer's written recommendations for<br />

environmental conditions for applying finishes.<br />

PART 2 - PRODUCTS<br />

2.01 METAL LATH<br />

A. Expanded-Metal Lath: ASTM C 847 with ASTM A 653/A 653M, G60, hot-dip galvanized<br />

zinc coating.<br />

1. Diamond-Mesh Lath: Self-furring,<br />

B. Paper Backing: FS UU-B-790, Type I, Grade D, Style 2 vapor-permeable paper.<br />

Project No.: 10145 CEMENT PLASTERING<br />

550 15th Street Dual Brand Hotel 092400 - 1<br />

10 May 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!