<strong>The</strong> <strong>Nimrod</strong> <strong>Review</strong><br />

6.40<br />

116<br />

Impingement on<br />

Forward Fuselage &<br />

Inner Wing<br />

Fwd Drain<br />

Mast<br />

Figure 6.4: MRA4 Showing Dispersal of Dyed Fluid<br />

1. Impingement on Bomb Bay Doors & Hinges<br />

Impingement on Bomb-Bay<br />

Doors and Hinges<br />

Figure 6.5: MRA4 Showing Dispersal of Dyed Fluid (close-up of wing root)<br />

If one extrapolates the results of this trial to the No. 1 blow-off valve operating, it is very easy to envisage fuel<br />

tracking back only 2.1 metres into the fairing of the SCP elbow and potentially the No. 7 Tank Dry Bay. <strong>The</strong><br />

prospect becomes even more likely given the fact that if the blow-off valve activated during AAR, the quantities<br />

of fuel expelled would be very considerable.