10B.75<br />

10B.76<br />

“Change<br />

17 Mar 2005<br />

Approving Officer<br />

[Witness C]<br />

Chapter 10B – <strong>Nimrod</strong> Safety Case: <strong>The</strong> Facts (Third Phase)<br />

Status<br />

Current: Managed<br />

Previous: Managed<br />

Initial Probability<br />

Remote<br />

Remote<br />

Post Probability<br />

Improbable<br />

Remote<br />

Rationale: IPT statement issued 16-3-2005 by NIM(ES)Safety:<br />

A further review of past incidences indicates no major occurrences of these hazards.”<br />

Thus, by the end of March 2005, all 105 hazards identified in the Phase 1 ZHA had been ‘sentenced’ down<br />

to a probability of “Improbable” (10-6 ), i.e. Class C ‘tolerable’, or less and these classifications entered into<br />

CASSANDRA.<br />

In this way, therefore, the final sentencing of hazards under the NSC was completed and an apparent<br />

‘baseline’ established which assumed that the <strong>Nimrod</strong> was, indeed, safe to operate as required by BP1201.<br />

This proved, tragically, to be false.<br />