Chapter 22 – Best Practice for Safety Cases<br />

Processes<br />

Action 12: Ensure that the independence of Airworthiness from the Project Team is established.<br />

Action 13: Ownership of the methodology for undertaking the SC <strong>Review</strong> is to be clearly defined.<br />

Action 14: Ensure greater awareness of Cassandra hazard log content at analyser level.<br />

Action 15: Photographs of zones assessed to be available for reviewers.<br />

Action 16: All processes to be clearly defined and documented.<br />

Action 17: Ensure that the assessment processes are under configuration control.<br />

Action 18: Ensure that all team members are working to the latest processes.<br />

Action 19: Processes to be reviewed and approved by key stakeholders.<br />

Action 20: Process to be developed for identifying quality and husbandry issues during the ZHA surveys.<br />

Action 21: Advise the NimIPT immediately of any safety related issues discovered.<br />

Action 22: Method of escalating issues to be defined, in particular in relation to “out of scope issues”.<br />

Action 23: Cross-zonal interactions to be addressed by “Integration Assessments”.<br />

Action 24: Clearer definition of A,D&Es and any limitations to be established.<br />

Action 25: A Stakeholder Group Technical <strong>Review</strong>, with representatives from all Stakeholders, to be established<br />

to review all SC products.<br />

Action 26: <strong>The</strong> breakdown of zonal interactions into individual mechanisms to be documented.<br />

Action 27: <strong>Review</strong> the approach, within the Cassandra hazard log, for the method of identifying differences<br />

between MR2 and R1.<br />

Action 28: Ensure zonal differences between MR2 & R1 zones are fully understood.<br />

Action 29: Seek additional sources of information for determining failure rate.<br />

Action 30: Ensure that there is one owner for each hazard who is responsible for collating information from<br />

supporting Functions when compiling the assessment.<br />

Action 31: Ensure that a full description of hazard to be analysed is included within the assessment (to avoid<br />

misinterpretation).<br />

Action 32: Separate assessment to be undertaken for each hazard cause.<br />

Action 33: Investigate alternative video technologies that could be used to support the assessments.<br />

Action 34: Ensure that photographs of zones are clearly annotated with the aircraft orientation.<br />

Action 35: All zonal hazard assessors to visit the aircraft when reviewing the aircraft zone.<br />

Action 36: Assessments of zonal hazards to include maintainer input.<br />

Deliverables and Acceptance<br />

Action 37: Define the approach to be taken by the NimIPT and by BAES in relation to any “Open” hazards.<br />

Action 38: Establish a clear point of ownership transfer to the NimIPT for the deliverables from SC2.<br />

Action 39: Refine the handover process for the deliverables from SC2.<br />

Action 40: Evidence of concurrence from the ITE (QinetiQ) should be obtained for each hazard.<br />

Action 41: A record of the acceptance of the hazard assessment by the Stakeholder Group Technical <strong>Review</strong><br />

should be maintained.<br />

Action 42: <strong>Review</strong> the technical accuracy of any NimIPT mitigation actions, against the hazards, prior to entry<br />

into Cassandra hazard log.”<br />

<strong>The</strong> University of York<br />

22.16<br />

Leading experts and service personnel charged with reading Safety Case material have expressed concerns<br />

to me as to whether Safety Cases are, in fact, improving safety and whether they are a cost-effective means<br />

of so doing. I share these concerns. Professor John McDermid’s Department at the University of York is a<br />

centre of excellence and the world’s largest academic research group looking at safety critical systems. Professor<br />

McDermid made a number of pertinent points to me about Safety Cases:<br />

537