07.03.2014 Views

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

economics of on-farm development - Institute for Social and ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

strictly adhered to the directi<strong>on</strong>s by the CADA.<br />

4) The right bank main canal (RBMC) <str<strong>on</strong>g>of</str<strong>on</strong>g> the Peechi project comm<strong>and</strong>s 23<br />

\'illages spread over 23 miles <strong>and</strong> the left bank main canal (LBMC) covers 9<br />

villages spread over 88 miles.<br />

5) The irrigati<strong>on</strong> scheme is envisaged <strong>for</strong> irrigating two crops <str<strong>on</strong>g>of</str<strong>on</strong>g> paddy. More<br />

emphasis is given <strong>for</strong> irrigating Kale l<strong>and</strong>s during summer.<br />

6) Farmers resorted to c<strong>on</strong>junctive use <str<strong>on</strong>g>of</str<strong>on</strong>g> canal <strong>and</strong> groundwater <strong>on</strong> a larger<br />

scale in the comm<strong>and</strong> area. Since the canals are unlined, seepage <strong>and</strong><br />

percolati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> water enabled substantial groundwater recharge which is being<br />

exploited by the <strong>farm</strong>ers to grow garden crops.<br />

4.1.1 History <strong>and</strong> salient features <str<strong>on</strong>g>of</str<strong>on</strong>g> the Peechi Irrigati<strong>on</strong> Project<br />

The Peechi dam is c<strong>on</strong>structed across the Karuvannur river having a total length<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> 48 kms. The catchment area is 1054 sq km. The Peechi project benefits 32<br />

\illages in the Thrissur district (see, Map 4.3 <strong>for</strong> Peechi ayacut).<br />

The project investigati<strong>on</strong> took place as early as 1930-35 al<strong>on</strong>g with other<br />

projects such as Chalakudy <strong>and</strong> Cheerakuzhi in Trichur district. The<br />

c<strong>on</strong>structi<strong>on</strong>, was. however. not taken up <strong>for</strong> executi<strong>on</strong> owing to financial<br />

difficulties. It was <strong>on</strong>ly after the end <str<strong>on</strong>g>of</str<strong>on</strong>g> Sec<strong>on</strong>d World War that the then Cochin<br />

government seriously c<strong>on</strong>sidered taking these projects <strong>for</strong> executi<strong>on</strong>. By about<br />

1946-47. the increasing food scarcity <strong>and</strong> the c<strong>on</strong>sequent high cost <str<strong>on</strong>g>of</str<strong>on</strong>g> food grains<br />

prompted the government to undertake the c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Peechi reservoir <strong>and</strong><br />

the Chalakudy river Diversi<strong>on</strong> schemes. Thus, prior to independence. the district<br />

had no major irrigati<strong>on</strong> system except the salt exclusi<strong>on</strong> work <str<strong>on</strong>g>of</str<strong>on</strong>g> Enamakkal dam<br />

(Kcrala State Gazetteer. 19(2).<br />

106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!