time lag involved in completi<strong>on</strong> uf the schemes was 19 years <strong>on</strong> an average in the<br />

case <str<strong>on</strong>g>of</str<strong>on</strong>g> completed schemes. However. the magnitude <str<strong>on</strong>g>of</str<strong>on</strong>g> unproductive lag appears<br />

to be enormous in the <strong>on</strong>-going schemes <strong>and</strong> is almost double that <str<strong>on</strong>g>of</str<strong>on</strong>g> the<br />

completed schemes, with an an:rage lag <str<strong>on</strong>g>of</str<strong>on</strong>g> 23.6 years. Menti<strong>on</strong> may be made <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

the Kallada <strong>and</strong> Kanjirapuzha schemes that have already completed 38 years<br />

without any substantial benefit to speak <str<strong>on</strong>g>of</str<strong>on</strong>g>. The cost per hectare <str<strong>on</strong>g>of</str<strong>on</strong>g> irrigati<strong>on</strong><br />

potential created under completed schemes was Rs. 1.39 lakhs <strong>on</strong> an average.<br />

Whereas, in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>going schemes, it was more than rupees <strong>on</strong>e lakh in 9<br />

<str<strong>on</strong>g>of</str<strong>on</strong>g> the 15 schemes. It is important to note that this expenditure has remained as<br />

sunk capital in the absence <str<strong>on</strong>g>of</str<strong>on</strong>g> any commensurate additi<strong>on</strong> to migated area.<br />

The physical <strong>and</strong> financial per<strong>for</strong>mance <str<strong>on</strong>g>of</str<strong>on</strong>g> the completed <strong>and</strong> <strong>on</strong>going<br />

irrigati<strong>on</strong> projects points to the phenomen<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> gross under-utilisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

potential to the extent <str<strong>on</strong>g>of</str<strong>on</strong>g> 35 to 45 per cent in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> most <str<strong>on</strong>g>of</str<strong>on</strong>g> the completed<br />

projects <strong>and</strong> almost 78 per cent in the case <str<strong>on</strong>g>of</str<strong>on</strong>g> <strong>on</strong>going schemes. Surprisingly, in<br />

I lout <str<strong>on</strong>g>of</str<strong>on</strong>g> 15 projects, no potential was created yet, in spite <str<strong>on</strong>g>of</str<strong>on</strong>g> massive flow <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

investment over the last two decades <strong>and</strong> more.<br />

An analysis <str<strong>on</strong>g>of</str<strong>on</strong>g> the trends In the financial expenditure <strong>and</strong> physical<br />

achievement in respect <str<strong>on</strong>g>of</str<strong>on</strong>g> the <strong>on</strong>-going irrigati<strong>on</strong> projects <strong>for</strong> the period \970-71<br />

to \999-2000 shows that during 1979-80, major chunk <str<strong>on</strong>g>of</str<strong>on</strong>g> the total investment<br />

earmarked <strong>for</strong> <strong>on</strong>going irrigati<strong>on</strong> projects has g<strong>on</strong>e <strong>on</strong>ly <strong>for</strong> four projects, viz.,<br />

Kuttiadi (23 to 32 %), followed by Periyar Valley (18-27 %), Pamba (\8-21 %)<br />

<strong>and</strong> Pazhassi pruject (11-18 %). From 1980-81 <strong>on</strong>wards. the trend has, however,<br />

changed in favour <str<strong>on</strong>g>of</str<strong>on</strong>g> Kallada. Periyar Valley <strong>and</strong> Mmattupuzha valley projects.<br />

The percentage share <str<strong>on</strong>g>of</str<strong>on</strong>g> Kallada in the total investment has increased from 21<br />